The linkspan approach. Presumably the substantial concrete wall was erected to prevent vehicles driving up the ramp and running into the dock after the service ended and before the dock was infilled.
The B&I Line container berth which once housed a container crane.
The Victoria Dock Container berth left. Waterloo River Entrance can be made out to the right.